Wednesday, March 14, 2007

Kitchen Remodel Part 2


Here are the lower cabinets and appliances going in. The only thing out of our control, the counter top installer, changed their original promise of a one week turn around time from time of templating to install. Now it's going to be three weeks. The pictures below show the upper cabinets installed. The kitchen is now pretty much ready for the counter tops with a few trim pieces and odds and ends left to do.

Mia posing in the new kitchen.

Now that this refrigerator is in, we get to have Marlene's old refrigerator (which is similar to this with double doors and water/ice). This will replace our old 80's, yellow refrigerator with many of the door shelves broken off. We are excited for this:)

The wall behind the stove is also going to be painted red. My mom will have more cabinets than she knows what to do with (but I'm sure she'll fill them all in no time). Jacob and Brian are pretty much awesome if you ask me!